Newfoundland and Labrador Hydro filed a Reliability and Resource Adequacy Study with the Board addressing both near-term and long-term reliability and supply adequacy for the province’s electrical system before and after the integration of the Muskrat Falls Project. The Study sets out Hydro’s view of near-term resource adequacy, long-term resource planning considerations and the resource options available to meet its proposed planning criteria.

 


Contact the Board
   
Email: board@pub.nl.ca
Telephone: (709) 726-8600 or (866) 782-0006
Fax (709) 726-9604
Mail Public Utilities Board
P.O. Box 21040, St. John’s, NL
A1A 5B2